CIOR
Chairman
Posts: 2,046
|
Post by CIOR on Sept 6, 2010 16:08:43 GMT -5
Not much, but keep checking youtube for more videos as I get them uploaded.
|
|
CIOR
Chairman
Posts: 2,046
|
Post by CIOR on Sept 6, 2010 18:23:48 GMT -5
Do some railfanning, watch a junk freight switch out some cars at Muncie yard...
|
|
CIOR
Chairman
Posts: 2,046
|
Post by CIOR on Sept 6, 2010 19:13:13 GMT -5
and final video for now
|
|
|
Post by Randy Earle on Sept 6, 2010 19:45:26 GMT -5
Looks good to me!
|
|
kcs1967
Chairman
SWLA-SETX PINE SCENTED
Posts: 1,726
|
Post by kcs1967 on Sept 6, 2010 19:47:21 GMT -5
Great Videos!!
|
|
|
Post by icghogger on Sept 7, 2010 9:29:37 GMT -5
Great Videos, Matt!! That looks like a good operating layout. Are you going to have your signals working soon?
|
|
CIOR
Chairman
Posts: 2,046
|
Post by CIOR on Sept 7, 2010 11:19:49 GMT -5
Thanks guys, The signal system will be after CIRROPS. Its all wired up and the long runs of CAT5 are pulled, but the brains have to be hooked up and the computer programmed. I just decided I had too much to do at this time. Plus all the staging has to be wired up as "dual control" and that is a mess of DPDT toggles and wiring like you wouldn't believe. Power in, Dispatcher in, Field in, OUT to field...... Not including the feedback to the dispatcher and the local control display!!!!
Each control point in the field is like that and I'm still working on the logic for the local control of dispatcher controlled unlocks.
|
|